
A raise, a launch or a press moment is about to send people to a site built for an earlier version of the company. Here is how to get it ready in time.
How long before a raise or launch should you start?
Plan for three to six weeks. Rewrite the story, rebuild the few pages that new visitors open, and launch at least a week before the announcement so nothing is still changing on the day. If you have less time than that, ship one strong page now and rebuild the rest after.
Who opens your site, and what they check
Visitor | What they check | Page that answers it |
|---|---|---|
Investors | Whether the company looks as serious as the round | Homepage, product, team, proof |
Buyers | Whether you solve their problem and who else uses you | Product or solution pages, case studies |
Journalists | A clear one-line description, founders and a press contact | About and press page |
Recruits | The team and what it is like to work there | About, team and careers |
What to fix first
1. Homepage message: one sentence on what you do and for whom.
2. Product or solution pages that match how buyers search.
3. Proof: logos, results and case studies.
4. About, team and careers.
5. Press kit and contact.
Startup website launch checklist
Run through this before the announcement goes out. Anything unticked a week before the date gets cut or simplified, not rushed.
Story and message
One sentence on the homepage that says what you do and for whom, in words a journalist could quote.
The new story reflected everywhere: homepage, product pages, about page and page titles.
Old positioning removed, including retired products, old pricing and stale team photos.
Pages and proof
Product or solution pages for each buyer you want to reach after the announcement.
Current customer logos, results and at least one case study.
An about page with the founders, the team and the story behind the company.
A careers page if the raise means you are hiring.
Press page and press kit
A short company description in one line and one paragraph.
Founder names, short bios and photos.
Logo files and product images people can download.
Recent announcements and a named press contact with an email address.
Technical checks
Titles, meta descriptions and social share images set for every key page.
Forms, analytics and CRM wiring tested on the live domain.
Every changed URL redirected, so links already out there do not break.
Every page checked on phone, tablet and desktop.
The full technical checklist, covering search and AI crawlers, speed, accessibility and trust, is further down this page.
What investors look for on a startup website
Investors use the site as a quick check on whether the company is as far along as the deck says. They look for a clear description of what you do, a product that looks real, customers or results, and a team they can put names and faces to. A site that still describes an earlier product, or shows a seed-stage design next to a Series A announcement, raises questions you do not want in a diligence call. Buyers now run the same check through ChatGPT, so it is worth learning how to get your B2B website cited by ChatGPT before the announcement.
What to put on your press page
Journalists on deadline want to copy, not ask. Give them a one-line description, a longer paragraph, founder bios, photos, logo files, recent announcements and a press contact. Put it on one page linked from the footer so it is easy to find on announcement day.
Working back from the date
When | What happens |
|---|---|
Six weeks out | Brief and story |
Five weeks out | First designed page on staging |
Two weeks out | Content complete |
One week out | Launch quietly and fix issues |
Announcement day | Nothing left to change |
Launching a week early matters more than it looks. It gives you time to catch broken forms, missing pages and typos while traffic is still low, and it means the site is already live and indexed when the press link goes out. If the new site replaces an old one, follow our website migration SEO checklist so the traffic lands on pages that still rank.
Launch day run sheet
Launch day should be boring. Here is the order we run it in, a week before the announcement.
Publish in a quiet hour on a weekday morning, not a Friday afternoon. Search Engine Land’s guide gives the same advice for any large site change.
Open every URL on your redirect list and check it lands on the right page.
Submit the sitemap in Google Search Console and request indexing for the homepage and key product pages.
Submit every form on the live domain and confirm each one arrives in your CRM with the right fields.
Check real time analytics shows your own visit, then exclude your team’s traffic.
Paste the homepage and press page links into Slack and LinkedIn to see the share preview.
Keep one person on call for the next 48 hours to fix anything that breaks.
The first two weeks after launch
Days one to three. Check Google Search Console for crawl errors and 404s every day, and fix any missing redirects the same day.
First week. Watch form submissions against the old site. A sudden drop usually means a form or tracking script is broken, not a lack of interest.
First week. Ask three people outside the company to find your pricing, a case study and the press contact while you watch. Fix whatever slows them down.
Second week. Ask ChatGPT and Gemini what your company does, and see whether the answer matches the new story. Our guide on getting cited by ChatGPT covers what to fix if it does not.
Second week. Update the pages that drew the most questions from investors or press, while the announcement is still fresh.
How long it takes and what it costs
A full Signature Site starts from $10,000 and goes live in three to six weeks. A Landing Page starts from $2,500 and goes live in about five working days. If the site is close but not ready, a Tune-Up is a fixed $5,000 over two weeks. All prices are fixed before work starts and paid half up front, half at launch. For the full breakdown, read what a startup website redesign costs and how long it takes.
A worked example: Series A announcement in six weeks
Say the announcement is six weeks away and the homepage, product pages and about page all describe last year’s company. Here is how we would plan it with our current packages.
Week | What happens | What you need to give us |
|---|---|---|
Before kickoff | Optional free 48 hour website audit | Access to the current site and analytics |
Week one | Story, sitemap and the first designed page on staging | The one-line message and the investor deck |
Weeks two to four | The remaining pages, CMS, press page and forms | Copy, logos, founder bios and photos |
Week five | QA, redirects and a quiet launch | Sign off on staging |
Week six | Announcement day, with nothing left to change | The press link |
That is a Signature Site, from $10,000. Most first builds cost $15,000 to $25,000, fixed before we start. If you are not sure the timeline works, book a 20-minute call and tell us the date.
How Wisk, Sydecar and GetScope did it
Wisk, the Boeing-backed autonomous aircraft company, went to a Webby-nominated site in two months. Sydecar rebuilt its site after its Series A so the website matched the company it had become, on a 50+ page Framer system its team uses to run 10x more growth experiments. GetScope went to an enterprise-ready site in 14 days.
If you launch often
Some companies have a moment every few weeks, not once a year. Reka, the NVIDIA-backed AI lab, worked with us as its embedded design and development team, and its pages went live the day each model shipped. That is what our Embedded Team is for, from $2,000 a month on a rolling basis.
Common mistakes before an announcement
Redesigning every page when visitors will only open five. Rebuild those first and leave the rest for after.
Waiting for perfect copy. Lock the one-line message early; the rest can be edited once the site is live.
Launching on announcement day. Anything that breaks then breaks in front of investors and press.
Changing URLs without redirects, so links from earlier coverage and partners stop working.
If the date is too close
Ship a Landing Page in five working days for the announcement, then rebuild the full site after. We cover how in how to launch a landing page in a week.
The full technical launch checklist
These are the checks that get missed most often in the last week. Each one takes minutes, and a developer or marketer can work through the whole list in an afternoon.
Search and AI crawler checks
The noindex tag from staging removed. Search Engine Land’s migration guide warns about a noindex tag left on from staging, which can quietly drop pages from Google.
robots.txt allows search engines in, including OpenAI’s search crawler. OpenAI’s crawler documentation says sites that block OAI-SearchBot will not be shown in ChatGPT search answers.
An XML sitemap submitted in Google Search Console on the day you go live.
One H1 per page, and a unique title and meta description on every page that matters.
Structured data for your organisation and articles, checked against what is actually on the page.
Speed, accessibility and devices
Key pages tested in Google PageSpeed Insights on mobile, with large images compressed before upload.
The site checked in Chrome and Safari on a phone and a laptop, not only the browser you build in.
Alt text on every meaningful image, readable colour contrast, and the main navigation usable with a keyboard.
A custom 404 page that links back to the homepage and your main product pages.
Trust and legal
HTTPS working on every page, with no mixed content warnings.
A privacy policy and cookie banner that match the tools you actually run.
A current copyright year, a working contact email and your company details in the footer.
Social share previews tested, so the link in the announcement shows the right title and image. Punchlist’s launch checklist and Webflow’s pre-launch checklist both call out Open Graph previews for this reason.
Sources
Ultimate site migration SEO checklist, Search Engine Land, for staging noindex mistakes and launch timing.
Overview of OpenAI crawlers, OpenAI, for how OAI-SearchBot affects ChatGPT search.
The essential pre-launch checklist, Webflow, and Website launch checklist, Punchlist, for share previews and pre-launch testing.
Goodspeed pricing, for every Goodspeed price and timeline in this post.
Work back from the date
Tell us the date and we will tell you what fits. Book a 20-minute call.
Frequently asked questions
How long before a funding round should I redesign my website?
What should be on a website launch checklist?
What do investors look for on a startup website?
What should a startup press kit include?
Can you build a website in time for a launch next week?
Should we launch the new site before the announcement?
What does a pre-launch website redesign cost?
What if we have announcements every few weeks?

Harish Malhi
Founder of Goodspeed
Harish Malhi is the founder of Goodspeed. He left Google in 2019 to build his own product, and started Goodspeed to give other founders the same head start. Today the studio designs and builds websites and the whole digital experience around them for funded tech companies, at the moments that matter: a raise, a launch, a press cycle. Goodspeed is a Framer Enterprise Expert, was Bubble’s Agency of the Year in 2024, and has shipped 300+ products, including launch pages for an NVIDIA-backed AI lab and a Webby-nominated site for a Boeing-backed aviation company. It holds a 5.0 rating from 46 reviews on Clutch.




